PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Cabinet unit heater at the sally ports Facing East.jpg Installing sprinkler piping at the 1st floor Facing North.jpg Prepping the duct work for the leakage testing at the 2nd floor.jpg Installed roof drains at the High Roof Facing East.jpg Installing Elevator car 1,2,3.jpg Installing sheating at the Sprinkler Room Facing South.jpg
Previous pageNext page Installing Elevator car 1,2,3
Installing Elevator car 1,2,3